After its commissioning in 2007, Riyadh Cement Company (RCC) quickly began to meet the growing demand for grey cement in the domestic Saudi Arabian and neighbouring markets. A second grey line was commissioned in 2010, increasing the combined production capacity to 11,000 tonnes per day.
In 2011, RCC became a subsidiary of Saudi White Cement Company. As market demand for white cement was increasing, RCC sought ways to increase its flexibility by switching from grey to white production. Saudi White Cement Company was already a renowned producer of white cement and sufficient raw materials were readily accessible to the plant.
The project team first considered constructing a new line specifically for white cement. However, following discussions with FLSmidth, it was quickly determined that converting one of the existing grey lines to produce white cement was a highly economical option.
Reusing assets
FLSmidth has developed a concept for modifying the existing equipment typically used in grey cement production in a cost-efficient way so that it can be used for dual production of white and grey cement. In recent years, FLSmidth has conducted several such conversions, including for Adana Cement in Turkey.
Before determining on the proposed solution, RCC representatives visited the Turkish site to observe the plant in operation. This visit, along with FLSmidth’s track record with RCC, led to the decision to convert the existing grey cement line to dual production, instead of building a completely new production line. Early in the project, testing of the raw materials was conducted at FLSmidth’s Research and Development facility in Denmark to ensure guarantees in whiteness and quality would be met.
Mr Sultan Al Dhuwaihi says: “We have a good relationship with FLSmidth as they have supplied us with various equipment and services, through the years, so we had a good impression of their ability to deliver. It is advantageous to have an equipment supplier with proven know-how about the technology for white cement production. In fact, nobody else has the same high level of knowhow.” Omar Rabia, Sales Manager at FLSmidth, explains that the aim was to achieve a payback of one year or less.
“It was important to be able to show the value of proceeding with the proposal by demonstrating experience, flexibility and the right pricing,” he says.
Upgrade benefits
The main part of the project involves installing an FLSmidth Duoflex® burner inside the kiln with quenching to take place inside the kiln tube and implementing relatively minor changes to the existing preheater.
A considerable amount of existing equipment is being reused, including the oil handling equipment, clinker cooler, raw material storage system and raw mill grinding equipment. With the proposed modifications, the kiln is expected to produce a minimum of 2,000 tpd white clinker with a maximum heat consumption of 1,350 kcal/ kg clinker.
Next steps
With a mid-2018 target for commissioning, the engineering phase of the project has been completed, as well as most of the purchasing, with final delivery expected in the beginning of 2018. The construction partner for the project is the Turkish company, Partner Teknik.
Mr Sultan Al Dhuwaihi comments: “The process so far has been good. We have had good design meetings and have received almost all engineering documentation, so we are looking forward to the mobilisation phase. I am confident we can rely on FLSmidth’s capabilities and tools as well as their know-how and experience so that we can quickly achieve our ambition of having full capacity of white cement in 2018.”
Conversion facts
The conversion of one of Riyadh Cement's existing grey cement lines to a dual process cement line for white and grey cement includes modifying the kiln and preheater area:
- Minor modification to the preheater tower
- The FLSmidth Duoflex® burner, which is ideal for white cement production
- Quenching equipment, including water pumps
- A complete electrical package, including modifications to the control system