Reduce cost

From minor plant changes to large projects, we cover the entire range of upgrades

Reduce cost

Snowmen disappear in Florida - more uptime and efficiency appear

Operational efficiency and increased uptime at Pennsuco

Pennsuco case

Case story: Pennsuco Plant

Titan Florida had recently finished the installation of a new production line supplied by FLSmidth and wanted FLSmidth’s help to deal with a number of challenges, including severe snowman formation caused by chemistry fluctuations and affecting the wear life of the original cooler inlet and costing the plant major annual repairs. The solution featured an ABC cooler inlet installed to improve the original Controlled Impact Section and set the model for future retrofits. Following the upgrade, both operational efficiency and uptime increased. Snowmen were eliminated; secondary and tertiary air temperature increased; and fuel consumption, clinker exit temperature and compressed air consumption decreased.

Watch interview
Pennsuco interview
Read the case story
Pennsuco case