Increase capacity

From minor plant changes to large projects, we cover the entire range of upgrades

Increase capacity

Collaboration cuts costs and increases capacity by 35%

From 3,400 to 4,500 tpd at the Indian Chilamkur plant

Chilamkur case

 

Case story: Chilamkur plant

The Indian Chilamkur plant wanted to increase capacity from 3,400 to 4,500 tpd in the most economical manner possible. Rather than replacing the existing preheater with a new, higher capacity tower, FLSmidth recommended installing a balancing tower, thereby utilising the existing preheater as well. All guaranteed performance parameters were achieved such as 1,700 tpd production from the balancing tower and 15 tph for the coal mill. By reusing existing equipment from a competitor and inserting FLSmidth technology in parallel, the plant got an innovative solution that increased capacity by 35 %.

Read the case story
Chilamkur plant